Trading Objectives
Unlock Your Full Trading Potential with us. Get up to $4 million to trade!
Account Sizes
Two stages, two mindsets
Find what works.
The Challenge phase is designed to give you room to try, test, and refine your trading strategy. Challenge rules offer more flexibility, so you can experiment and determine what works for you before moving to the Sim. Funded stage.
More flexibility for testing your strategy
No 2% Risk per Trade Idea
No minimum profitable days
More flexibility to test your strategy
Do what works.
The Sim. Funded stage is designed to help you apply the strategy you’ve developed and proven. The goal is to maintain discipline and build a repeatable approach through structured execution and responsible risk management.
Rules to encourage more discipline and focus
2% maximum Risk per Trade Idea
Profitable-day requirement*
Other changes depending on the plan
Challenge Account
Targets - How To Pass
Phase 1
6%of initial balance
Rules - Hard Breach
EOD Trailing Drawdown — 4%
Once the account reaches 4% profit, the max trailing locks at the initial balance and stops trailing. (3% for $100k and $150k accounts)

End of the Day Balance
4% trailing floor — never breach
The Maximum Loss Limit follows the highest end-of-day balance (High Water Mark) until you reach a 4% net profit, then it locks at the starting balance.

Your Maximum Loss Limit always remains $2,000 below your highest end-of-day balance (High Water Mark). It only trails upward and never moves downward. Once your account reaches $52,000 (+4%), the limit locks at your starting balance ($50,000) and no longer trails.
EAs
| Account Size | Maximum Position Size |
|---|---|
| $25K | 1/10 Contracts |
| $50K | 3/30 Contracts |
| $100K | 7/70 Contracts |
| $150K | 10/100 Contracts |
Hola Prime (Sim. Funded) Account
Rules - Hard Breach
EOD Trailing Drawdown — 4%
Once the account reaches 4% profit, the max trailing locks at the initial balance and stops trailing. (3% for $100k and $150k accounts)

End of the Day Balance
4% trailing floor — never breach
The Maximum Loss Limit follows the highest end-of-day balance (High Water Mark) until you reach a 4% net profit, then it locks at the starting balance.

Your Maximum Loss Limit always remains $2,000 below your highest end-of-day balance (High Water Mark). It only trails upward and never moves downward. Once your account reaches $52,000 (+4%), the limit locks at your starting balance ($50,000) and no longer trails.
Max Risk Per Trade Idea
The maximum risk you can take on any single trade idea
2% MAX On a $100,000 account, the max risk per trade idea is $2,000
"Risk" refers to the maximum amount at stake on a trade or trade idea, determined by the stop-loss placement. A Stop Loss (SL) is mandatory on every trade.
Only the risk taken matters, not the loss: If an SL is set within the 2% risk limit, any additional loss caused by price differences will not be considered in risk calculation.
A floating or realized loss exceeding 2% on a trade or trade idea without an SL will be considered a breach.
The risk per trade idea must not exceed 1% of the initial account balance for DX Futures
Example
- Splitting one idea into multiple positions that overlap in time still counts as one trade idea.
- Total risk (based on stop-loss levels) should not exceed 2%.
Account balance $100,000

Risk Rule Breach — Total risk: 2.1% ($2,100). Maximum allowed: 2% ($2,000)
- Re-entering the same asset in same direction within 10 minutes counts as same trade idea
- Total risk (based on stop-loss levels) should not exceed 2%.
Account balance $100,000

Risk Rule Breach — Total risk: 2.5% ($2,500). Maximum allowed: 2% ($2,000)
- Overlapping positions and redefining re-entries are treated as single trade idea.
- Total risk (based on stop-loss levels) should not exceed 2%.
Account balance $100,000

Risk Rule Breach — Total risk: 2.3% ($2,300). Maximum allowed: 2% ($2,000)
EAs
Maximum Exposure Limit
| Account Size | Maximum Position Size |
|---|---|
| $25K | 1/10 Contracts |
| $50K | 3/30 Contracts |
| $100K | 7/70 Contracts |
| $150K | 10/100 Contracts |
Payout Cycles
Payout split
Request every 7 calendar days
Consistency = 35%
The biggest winning day cannot exceed 35% of the total profits made in the account
Profitable Days
Minimum 5 profitable days (non-consecutive), each with a Net PNL depending upon account size as given below:
Payout Amount
Payout Cap
Account Review
Account review is a requirement for payout eligibility and is conducted for every payout to verify compliance with the applicable rules and terms. Once all other payout eligibility conditions are met, your account will undergo a review. After the review is completed, you will be eligible to request a payout. All payout requests are processed within one hour of submission.Get Guaranteed Payouts.
1-hour
1-hour

Zero
Zero




